What's new

Nearly there...

"Samantha"

Achiever
Joined
Apr 12, 2018
Messages
1,355
It has been 1 long month
One more weekend to finish it though then it is on with the downstairs ready for the new machine.
The tables and the rest of mixers etc still need to be brought in but we are very nearly there.
Only outside help we have had is an electrician.
We are having a well earned night off bowling with the staff from the shops.
 
Might help if I added a photo hey?

PhotoGrid_1536337760858.jpg
 
Thank you guys. The photos do not show the blood sweat and tears that has gone in to doing it.
Craig has been working nights on it too so we are both pretty tired.
Downstairs will take another month or so to complete as we need to remove walls, remove the old clean room and lay new flooring.
But...I got a turkey last night :D
11 of us staff vs customers and it was very much needed to have a night off.
Back on it today though: (
20180907_210145.jpg
 
Thank you guys. The photos do not show the blood sweat and tears that has gone in to doing it.
Craig has been working nights on it too so we are both pretty tired.
Downstairs will take another month or so to complete as we need to remove walls, remove the old clean room and lay new flooring.
But...I got a turkey last night :D
11 of us staff vs customers and it was very much needed to have a night off.
Back on it today though: (
View attachment 172042
Looks like a good time was had by all .........
 
Finished apart from the printer and pc to be moved up on Monday
 

Attachments

  • received_300062824117242.jpeg
    received_300062824117242.jpeg
    65.4 KB · Views: 155
  • received_248270522499220.jpeg
    received_248270522499220.jpeg
    99.8 KB · Views: 159
  • received_2065915693707344.jpeg
    received_2065915693707344.jpeg
    81.4 KB · Views: 148
  • received_1099626653533263.jpeg
    received_1099626653533263.jpeg
    658.2 KB · Views: 158
  • received_326086927937474.jpeg
    received_326086927937474.jpeg
    529.5 KB · Views: 150
  • received_292219018242244.jpeg
    received_292219018242244.jpeg
    694.1 KB · Views: 152
  • received_537240146697669.jpeg
    received_537240146697669.jpeg
    577.4 KB · Views: 152
  • received_227862314747547.jpeg
    received_227862314747547.jpeg
    498.4 KB · Views: 145
  • received_537240146697669.jpeg
    received_537240146697669.jpeg
    577.4 KB · Views: 169
  • received_456790894841596.jpeg
    received_456790894841596.jpeg
    465.9 KB · Views: 148
5 days later and we are half way through the downstairs conversion.
Yes we are very low on stock now but hopefully the downstairs transformation won't take as long as upstairs so we can get back to doing what we are best at.

Up to now we have removed 2 walls, one clean room, made two rooms into one, and today I even transformed the loading bay with safety flooring for the forklift.
We both have blood blisters, are both shattered but it will be worth it once it is all done.
Roll on November now.
Here is a quick pic of the new look loading bay. Not bad for a girl even though it took me 4 hours :D
 

Attachments

  • IMG_20180913_132621_750.jpg
    IMG_20180913_132621_750.jpg
    1.2 MB · Views: 147
Back
Top Bottom